Case study · Megha Engineering & Infrastructures Ltd
300 feet underground at Kaleshwaram.
From 2017 to 2020, a 20-member Royal Engineering Works team supplied and installed kitchen equipment, canteen furniture, stainless steel and glass railings and custom fabrication across MEIL's sites on the Kaleshwaram Lift Irrigation Project in Telangana.
- Client
- MEIL
- Project
- Kaleshwaram Lift Irrigation
- Duration
- 2017 – 2020
- below ground, in the pump-house tunnels
- 300 ft
- member Royal Engineering Works crew
- 20
- MEIL sites across Telangana
- 5
- of continuous delivery, 2017–2020
- 3 yrs
The project
A lift irrigation scheme built inside the rock.
The Kaleshwaram Lift Irrigation Project is the world's largest lift irrigation scheme: a chain of pump houses, tunnels and reservoirs that lifts Godavari water to the farmland of Telangana. Many of its pump houses sit deep underground, carved out of solid rock.
Megha Engineering & Infrastructures Ltd (MEIL) built the pump houses. For the railing works and custom fabrication inside them — plus canteen kitchen equipment and dining tables for its sites — MEIL brought in Royal Engineering Works: not a supplier dropping stock at the gate, but a crew that could fabricate, fit and finish on site, alongside heavy machinery, at every package.
For three years, that crew was ours. Twenty people from Royal Engineering Works moved between five sites — Karimnagar, Siddipet, Gowraram, Pregnapur and Godavarikhani — delivering everything from the canteen kitchens that fed the workforce to the railings that now ring the pump units.
What we delivered
From the canteen to the pump floor.
- 01Commercial kitchen equipmentCooking, storage and preparation equipment for the site canteens that fed the project workforce.
- 02Canteen dining tablesStainless steel dining tables for the canteens, built to take shift-after-shift use.
- 03SS chain railingPolished stainless steel posts and chain around the pump units on the main pump house floor.
- 04SS staircase railingStaircase and opening railings for the pump houses, fabricated and fitted in place.
- 05Glass railingEtched glass balustrades with stainless steel fittings for the control building balconies.
- 06Custom fabricationMade-to-measure stainless steel work to site requirements, as each package needed it.


The conditions
Critical oxygen. A bridge four feet wide.
Much of the work happened 300 feet below ground, in tunnels where oxygen levels were critical. Every sheet, every length of pipe and every welding set had to be taken down to the work front — and the finish still had to be good enough for one of the state's showpiece plants.
At Gowraram, the railing ran along a bridge just three to four feet wide, with pumped water rushing on one side and bare rock on the other. There was no room to set up, no room to stand back, and no second chance at a weld. Our team measured, fitted and fixed that railing section by section, until the walkway was safe.
It was the hardest job we had taken on. We delivered anyway.
Gowraram · The narrow bridge
Railing a four-foot bridge, one section at a time.
Open water chambers on one side, the embankment on the other, and a walkway barely wide enough for a welding set. These are the photos from the day the railing went in.

The Gowraram walkway, railing on both sides 
Welding along the bridge, open chambers alongside 
The chambers below the walkway 
SS railing along the channel edge 
Looking down: the drop beside the work
On site
The work, as it was installed.
Photos from MEIL package sites, 2017–2020

Pump house floor — SS railings around each pump unit 
SS railing with diamond infill 
Pump house staircase railings 
Etched glass railing — Link-II, Package 8 control building 
Posts set around a pump unit 
Chain railing, mid-install 
Fitted while the pump house was still under scaffolding 
Unit after unit, the full length of the hall
The outcome
Delivered — and inaugurated by the Chief Minister.
The project was inaugurated by the then Chief Minister of Telangana, K. Chandrashekar Rao — with our railings, staircases, glass balustrades and canteens part of the finished plant. For a team founded just a year before the work began, it set the standard we still hold ourselves to: if the site is hard, we plan harder.
Sites we worked on
- Karimnagar
- Siddipet
- Gowraram
- Pregnapur
- Godavarikhani
Planning a site others call difficult?
Canteens, railings or custom stainless steel — tell us about the site and we'll tell you how we'd deliver it.